Construction of new Garda station and siteworks. link text
Construction of a 3 storey resource centre with all associated siteworks
link text
Refurbishment of Bus Aras within existing building.
Construction of the 3-storey over basement extension was in reinforced concrete with blockwork infill panels to the rear with a steel framed connection to the existing gallery.